Project Start Date: Thu 4/17/08
Project Finish Date: Mon 5/19/08

Roboto's Project Schedule

Name
Start_Date Finish_Date
Aaron assemble gripper for Boe-Bot 2
Tue 4/15/08 Wed 4/16/08
Shervin assemble gripper for Boe-Bot 1
Thu 4/17/08 Fri 4/18/08
Shervin Design gripper movement assembly
Fri 4/18/08 Mon 4/21/08
Shervin make gripper movement assembly
Mon 4/21/08 Thu 4/24/08
Aaron program Gripper/Arm movements
Fri 4/18/08 Wed 4/23/08
Shervin and Aaron program Large body movements
Fri 4/18/08 Tue 4/22/08
Aaron adjust gripper for grabbing Lego for Boe-Bot 1
Tue 4/22/08 Thu 4/24/08
Aaron assemble base of rotating platform - did not use
Mon 4/28/08 Mon 4/28/08
Aaron and Shervin assembled and programmed digital encoder
Tue 4/29/08 Thu 5/8/08
Jacob redesigned base of rotating platform
Thu 5/1/08 Fri 5/2/08
Aaron Program stepper motor - did not use
Thu 5/1/08 Fri 5/2/08
Shervin repositioning gripper arm
Thu 5/1/08 Thu 5/1/08
Aaron create base of rotating platform
Thu 5/1/08 Thu 5/1/08
Jacob design and create an elevation actuator
Sat 5/3/08 Mon 5/5/08
Aaron write program for elevation actuator
Sat 5/3/08 Sun 5/4/08
Aaron program large body movements for Boe-Bot 2
Tue 5/6/08 Wed 5/7/08
Shervin write project section of Abstract
Fri 5/9/08 Mon 5/12/08
Jacob write design section of Abstract
Sat 5/10/08 Tue 5/13/08
Aaron write flowcharts for Boe-Bot 1 and 2
Sat 5/10/08 Mon 5/19/08
Shervin write program for gripper movements
Sun 5/11/08 Thu 5/15/08
Aaron and Shervin work on PowerPoint presentation
Tue 5/13/08 Mon 5/19/08
Jacob and Aaron designed/build tread elivator and gripper extension
Tue 5/13/08 Mon 5/19/08
Jacob write conclusion and design section of abstract
Tue 5/19/08 Mon 5/19/08
Jacob, Aaron, and Shervin finish writing code and setting up track
Tue 5/19/08 Mon 5/20/08